Priors Field School

Armfield Construction were appointed on a design and build contract, the project comprises a new classroom block comprising the demolition on an existing single storey building and the construction of a new two and a half storey building of approximately 1100 sq.m  Priors Filed School was a particularly challenging project due to the School Run Access Route having to be kept live at all times. This was achieved by working closely with the professional team, and the school, and carefully planned thus to minimise disruption to the school, pupils and parents alike. Various proposed access plan routes were tabled to the team, and together with the teams input after numerous discussion a suitable plan was adopted and put into place. As well as hoardings, zebra crossings were put in place and carefully monitored by the site management and the onsite banks man to which we received a high level of positive feedback throughout project not only from the school but also the parents who were on the daily school run.